New 14 megawatt 15kV power generation plan and underground campus distribution system. Separate campus medium voltage distribution and pad mounted switches for essential and normal power systems. Major electrical upgrades to multiple buildings including the addition of 9 unit substations, 16 transfer switches, distribution and branch circuit panels. Campus wide SCADA system with monitoring and control of all switchgear, generators and fuel systems.