Refurbishment of three relocated gantry cranes for Port Tampa Bay.  Performance specification included the conversion of existing electrical bus bar pick-up system to a new pull-and-store horizontal cable reel power feed system.  New crane mounted GE 13.2kV – 4160/480V switchgear was specified along with general crane electrical upgrades and improvements.