Verizon Central Energy Plant

Verizon Central Energy Plant

New Central Energy Plant with three diesel generators, four 1100 KVA UPS systems, three 600-ton variable speed chillers and 4000A double ended main switchgear. Permanent load bank system for testing generators and UPS systems. UPS power was delivered to the existing data center through four 1600 Amp switchboards configured in an A1/B1, A2/B2 configuration for […]

Read More
Port Tampa Bay

Port Tampa Bay

Three story, 42,000 square foot glass/steel structure featuring a 70 foot glass atrium with a 52 foot diameter world globe.  Design of emergency power, HVAC, plumbing and fire systems.  Two 150 ton air cooled chillers, central air handlers for each floor.  Central outside air and exhaust risers.  Direct digital control system, atrium air conditioning system […]

Read More
Buccaneers Training Room

Buccaneers Training Room

New construction of 140,000 SF training center including 10,000 SF weight room, 7,000 SF locker room, fully equipped kitchen and dining room, theater style auditorium and press conference studio. Complete electrical system design including energy efficient lighting indoors and outdoors with specialized lighting control and dimming; Independent electrical distribution for corporate offices maintenance facilities, including […]

Read More